99re视频热这里只有精品7-情欲少妇人妻100篇-亚欧免费无码aⅴ在线观看蜜桃-亚洲国产一区二区精品无码-国产成人精品一区-国内自拍第23页-中文无码一区二区不卡αv-91精品国产99-一二三区乱码不卡手机版-天堂在线资源8-日本午夜免费福利视频-夜先锋av资源网站-色站综合-又爽又黄无遮拦成人网站-手机在线亚洲国产精品-亚洲黄色免费网站-欧美人与禽zozzo性伦交-黑人三级视频-麻豆久久久久久久-欧美多毛肥妇视频

Shenzhen MCC20 Meiguan Expressway Project Completes Main Structure of Left Auxiliary Road No. 1 Bridge
Source: Author:Department of Party-Masses Work Date:26 February 2025
 
 

       On January 13, the main structure of the Left Auxiliary Road No. 1 Bridge, part of the Shenzhen MCC20 Meiguan Expressway Project, was completed, providing strong momentum for the project’s progress. 

 

        The Left Auxiliary Road No. 1 Bridge is strategically located, adjacent to the Meiguan mainline and crossing over Ramps C, D, and E, as well as Bulong Road. The bridge consists of six sections with 19 spans, totaling 679.8 meters in length. The first three sections each have three spans, while the fourth and fifth sections each have four spans, with each span measuring 35 meters and a deck width of 16.9 meters. The sixth section has two spans, each 40 meters long, with a deck width of 12.8 meters. The construction process employed segmental beam assembly for the first five sections and cantilever assembly for the sixth section. The entire superstructure consists of precast concrete segmental beams, with the erection period lasting 11 months. This is the second segmental beam bridge erected using a gantry crane in the Meiguan Expressway Project. 

 

       The project team overcame numerous technical and environmental challenges to ensure the smooth progress of the construction. Particularly noteworthy is the cantilever assembly and erection method employed for the sixth segment, which differs significantly from the previous full-span installation approach. This method requires symmetrical construction centered on the base, with each pair of precast beams needing to be aligned and tensioned sequentially. This process demands exceptionally high precision in terms of axis alignment and elevation control. Moreover, as the construction of the sixth segment spans Bulong Road, a route with heavy traffic flow, work could only be carried out during nighttime road closures. The project team placed great emphasis on this aspect, formulating a detailed safety construction plan to ensure both road safety and project progress during the construction period. 

 

         The completion of the main structure of the Left Auxiliary Road No. 1 Bridge not only prepares for the full opening of the western line but also provides the necessary conditions for the subsequent demolition of three mainline bridges and the construction of the eastern line. The Meiguan Expressway Project will continue to uphold a meticulous attitude, ensuring the high-quality progress of all project milestones and contributing to urban transportation construction and the optimization of the regional transportation network. 

Phone:+86-21-6679 8399 Fax:+86-21-3601 0066
Address:#777 Pangu Road, Baoshan District, Shanghai, China.